Description | Skills | Funding |
Distribution and treatment of drinking water and collection and treatment of wastewater | Waterworks Operations, Wastewater Operations, Water Treatment, Hydraulics, Pumps and Valves, Process Control and Instrumentation. |
Some equipment overlap with Industrial Maintenance and Mechatronics/Automation.
Rolling Application Cycle: EDA Public Works “Skill-Training Facilities” Grant (rolling cycle); area must be distressed. Average award size $1.4M. 12 – 48 months for Construction Projects; 12 – 24 Months for Non-Construction Projects. |